I this week was doing the necessary adjustments on the simulator to include the other onshore converter station and the others two lines transmission.

Was even included a different model of voltage control in order to take advantage of a power sharing between the two stations, beneficial in situations of network failures.

It were obtained the first correct results of the simulator even with a basic model of control onshore converter and without upstream network.

 